Factory Planner

Schneider Electric
Gard, Occitanie
Full time
2 weeks ago

Manages the process of Production Planning and cell loading. Plans and coordinates the allocation of raw materials between facilities and other manufacturing sites (both internal & external) to optimize the production of division products based on the Master Production Schedule (MPS), raising the necessary heads-up on critical materials affecting the MPS build. Analyzes supply status and availability of Finished Goods from Distribution Centers (DC) worldwide and realigns Finished Goods supply for healthy stocking.
  • Drives materials availability to support MPS buildplan and works with Procurement team to ensure timely deliveries of raw materials
  • Analyzes MPS misses on Line Item (LIPAS) and Volume Performance (VOLPAS) against Schedule and relates the impact of misses on the Backorder Report / Release Unshippable (RU)
  • Prepares a Recovery Plan for products or product family with critical Distribution Center (DC) and in-transit Finished Goods (FGs) supply and communicates excemption report to Management team, Demand and Supply Chain (SCP) Corporate Planning group
  • Projects possible backorders and requests the necessary changes in MPS to recover from the backlog
  • Reviews corporate sourcing report for DC allocation and shipments prioritization.
  • Establishes priorities and sets logistics directions for specific customer order in product shortage situations.
  • Works with New Product Development/Transfer (NPD/NPT) Planners and divisional management to ensure that prior to product transitioning, phase out product have healthy supply positions and material supplies pipeline for those being phased in are in place
  • Ensures Discrete Jobs are available in the oracle system
  • Works in tandem with Production Planning & Control (PPC) Planner for availability of locally supplied or Just in time (JIT) material Works with Engineering support team on parts with Engineering Change Order (ECO) affecting the products.
  • Maintains tracker file for MPS LIPAS and production status information
  • Works with Operations team on manufacturing issues affecting the plan and escalates gap on any capacity contraints on resources - manpower, machine, method
  • Works with Product or Mfg Engineering in looking for alternate parts or process improvements
  • Follows thru timely preparation and release of ECO documentation for identified alternate parts
  • Coordinates with Operations and Supply Chain team on inventory management and improve customer satisfaction
Qualifications
  • College Graduate, preferably an Engineering course, Accountancy or Mathematics.
  • With at least with 2yrs Planning experience or related Supply Chain function acquired from an electronics manufacturing industry.
  • With Knowledge in Oracle system; highly proficient in Excel software application
  • Excellent planning organizational and good communication skills.
  • Strong knowledge of different inventory planning methods and applicable supply chain tools
  • Possess good analytical skills and quantitative bias

Primary Location: PH-40-Cavite

Schedule: Full-time
Unposting Date: Ongoing
Apply
Other Job Recommendations:

Factory Worker - San Juan City, Manila

Manufacturing of Food Ingredients
  • Candidate must be at least High School Graduate
  • Can lift at least 25kg and above...
2 weeks ago

Factory Worker - Muñoz, Quezon CIty

Manufacturing of Food Ingredients
  • Candidate must be at least High School Graduate
  • Can lift at least 25kg and above...
2 weeks ago

Part-time Factory Worker

J-Ricks Enterprise
  • Bindery
  • Sorting and packing
  • Revise and check quality of jobs...
3 weeks ago

Factory Worker (Machine Operator)

Whirpool and Abenson
₱15,000 - ₱20,000
  • High school Senior high Graduates can apply
  • With or without working experience can apply must be willing...
3 weeks ago

Digital Factory Deploy Engineer

Unilever
  • Software Development: Work with other members of Digital...
  • Deployment and Integration: Implement and integrate software...
4 weeks ago