Search suggestions:

work from home
urgent hiring
office staff
work from home no experience
virtual assistant no experience
part time
industrial engineer
civil engineer
procurement
accounting
part time work from home
job hiring
bank
Davao City
Laguna
Kabite
Batangas
Cebu City
Manila
Remote
Bulakan
City of Carmona
Pampanga
Tarlac City
Nueva Ecija

Fabricator of Pushcarts

WWF-Philippines
Cagayan de Oro
1 day ago

Project Site: Cagayan de Oro City and Siargao Island

Reports to: Project COPE Project Manager

Period Covered: August-September 2025

BACKGROUND

WWF-Philippines invites qualified suppliers to submit proposals for the procurement of containers modified as materials recovery facilities (MRF) and to support the Circular Operations for a Plastic pollution-free Environment (COPE) Project. The project aims to enhance waste segregation and solid waste management in selected project areas within Cagayan de Oro City and Siargao Island.

WWF-Philippines is a non-profit organization that works to improve Filipino lives by crafting solutions to climate change and conserving the country’s richest marine and land habitats. WWF is currently implementing the "No Plastics in Nature Initiative (NPIN)”, a global initiative that aims to stop plastic waste leakage into nature by 2030 through the elimination of unnecessary plastics, doubling reuse, recycling, and recovery, and ensuring remaining plastics are sourced responsibly.

Project COPE works with local government units and waste workers –– particularly from select barangays in Cagayan de Oro City and the municipalities of Del Carmen and General Luna in Siargao Island –– in piloting a replicable system for solid waste management. This includes enhancing waste collection and segregation. Through this procurement, the provision of infrastructure such as MRFs will help support regular waste collection schedules, ensure proper waste handling, and alleviate challenges faced by areas with inconsistent waste collection due to narrow roads and other logistical issues.

PROJECT GOALS


The equipment will be deployed to benefit selected barangays and waste workers in Cagayan de Oro City and Siargao Island. This initiative is part of WWF-Philippines' commitment to:

  • Encourage proper waste segregation.
  • Support local solid waste management efforts.
  • Prevent the leakage of plastic into the open environment.

SPECIFIC DUTIES AND RESPONSIBILITIES

Specifically, the Fabricator will have the following responsibility:

  • Provide a quotation for the fabrication of modified containers with the following specifications (download supporting images PDF below as a reference guide):
    • Product Material: tubular and steel matting
    • Product Design: To be embossed/branded with the WWF and partner LGU logos
    • Product Dimensions: 20 feet standard container
  • Submit to WWF-Philippines its complete business documents, permits and official receipts;
  • Be available for consultation and meetings prior to purchasing the product;
  • One-month after the deployment of the product, the supplier will do a “check-in” or evaluation of the product to see if there is any room for improvement to the design;
  • Consult regularly and work closely with WWF-Philippines.

EXPECTED DELIVERABLES

Deliverable
Delivery Date (Due)

Submission of quotation, complete business documents, permits and official receipts
August 29, 2025

Signing of Contract
September 3, 2025

Submission of prototype based on approved design and conduct durability test
September 10, 2025

Turnover of containers: 7 units
September 30, 2025

SUBMISSION GUIDELINES

Interested parties should submit their proposals including:

  • Product Design
  • Lead Time
  • Payment and Delivery Terms
  • Warranty Period
  • Business/Mayor’s Permit
  • SEC or DTI’s Permit
  • BIR 2303 Certificate of Registration
  • Sample Official Receipt

SUBMISSION DEADLINE

All proposals must be submitted by 29 August 2025. For further inquiries and submission of proposals, please contact Arianne Garcia ([email protected]) and Julius Guirjen ([email protected]).

Submissions by mail will not be accepted to reduce the use of paper.

Apply
Save
Report job
Other Job Recommendations:

Fabrication Manager

Apex Hub Management & Services Inc
Rizal
₱30,000 - ₱35,000
  • Supervise and manage all fabrication activities and...
  • Plan daily and weekly workloads in coordination with...
2 weeks ago

Fabrication Assistant Supervisor

Bandai Wireharness Philippines, Inc.
Tanauan, Batangas
Tooling Fabrication & Maintenance Supervise the fabrication, repair, and preventive maintenance of jigs, fixtures, and checker...
2 weeks ago

Mechanic/Welder/Fabricator

Matsuform Link, Inc.
Tanauan, Batangas
Highschool graduate or vocational course graduate (Automotive, Mechanical, Welding, or Auto Body Repair) With hands-on experience...
2 weeks ago

Welder Fabricator

A.Q. TY TOWN BUILDERS CORP.
Rizal
Qualification: - At least College Level or graduate of any vocational course. - Preferably with NC II certificate - With at least...
1 week ago

Sheet Metal Fabricator Helper

Subic Bay Freeport Grain Terminal Services, Inc
Olongapo
  • Company Christmas gift
  • Company events
  • Free parking...
1 week ago

Fabricator

KRAH PIPES MANILA INC
Bukidnon
  • At least 2–4 years of experience in metal fabrication,...
  • Proficient in welding techniques (or other relevant methods)
6 days ago

Welder/Fabrication Supervisor

DC Steel Works OPC
Bulakan
  • Manage assigned manufacturing team members to ensure product...
  • Identify, recommend, and implement changes to improve...
5 days ago

Sheet Metal Fabricator

Subic Bay Freeport Grain Terminal Services, Inc
Olongapo
  • Company Christmas gift
  • Company events
  • Free parking...
1 week ago

Fabrication Supervisor

Victowin Engineering Services and Trading
Cabuyao, Laguna
₱25,000 - ₱30,000
  • Male/female
  • Atleast 10 years experienced in metal and stainless...
  • Graduate in any technical/engineering...
3 weeks ago

Fabricator (Project Based)

Mheco Inc.
Calamba, Laguna
  • 8 hour shift
  • 13th month salary
  • Overtime pay...
2 weeks ago